Your Name & Project
Progress
As each project is unique, so too are the project timelines and deliverables. The below is a sample of a typical, medium-sized project. For your project, these timelines and phasing would be adjusted to reflect your Proposal for Architectural Services.
As-Built Services
This phase is required for remodels and additions only.
Estimated Timeline: TBD weeks*
•Start Date: TBD
•Completion Date
Schematic Design (SDs)
Estimated Timeline: TBD weeks*
•Start Date: TBD
•Initial Designs Meeting:
•Refined Design Meeting:
Design Development (DDs)
Estimated Timeline: TBD weeks*
•Start Date: TBD
•DD Review Meeting:
Landmark and / or HOA Application
This phase is project dependent. Its length and complexity vary with scope and location. More information will be provided as the scope is defined during SDs.
•Start Date: TBD
Construction Documents (CDs)
Estimated Timeline: TBD weeks*
•Start Date: TBD
•35% CD Review Meeting:
•65% CD Review Meeting:
•100% CD Review Meeting:
•Date of Permit Submittal:
Construction Administration (CA)
Estimated Timeline: refer to GC
Optional: HQA is available to support you through construction and can provide you with a list of optional services to help ease your construction experience.
Project Closet-out
•Photoshoot (with your permission)
•Review of Your Experience
•Selection of Donation Recipient
*The times listed reflect the estimate of time required for our design work. While we endeavor to work concurrently with engineers and all other consultants in order to streamline the design process, delays in their schedules or any needs that you as the client may have to spend more time considering design options, may prolong the estimated timeline for any given phase.
Team
For each team member, we are happy to refer you to professionals with whom we and our clients have had positive experiences or work with someone new you have in mind!
Architect: HQ Architects
Alison Hagan, AIA | 720.299.2267
•alison@hqarchitects.com
Anne Quallick, AIA | 303.881.7954
•anne@hqarchitects.com
General Contractor (GC)
TBD
Interior Designer
TBD
Mechanical Subcontractor
(The mechanical sub will be brought onto the team through the GC.)
TBD
Soils Engineer
TBD
Structural Engineer
TBD
Survey Engineer
TBD
Deliverables
As each drawing set is completed, a hyperlink will appear below under its design phase. Each project’s list of deliverables will be unique to its needs. Below are milestone sets typical to most projects.
Schematic Design (SD)
Initial SD Options
Refined SD
Design Development (DD)
Progress DD Review Set
100% DD Review Set
Construction Documents (CD)
Architecturals:
•Progress CD Review Sets
•100% CD Review Set
•Draft IECC Report
Structurals (by others):
•Draft Set
Permit Materials
Application
Architecture Final CD Set
IECC Report
Manual J Report
Soils Report
Structurals: Final Permit Set and Calculations
Survey
Construction Administration (CA, optional)
Field Reports